<ins id="5lpvr"><noframes id="5lpvr">

        <ins id="5lpvr"><form id="5lpvr"></form></ins>

        <delect id="5lpvr"></delect>
        <b id="5lpvr"><form id="5lpvr"><b id="5lpvr"></b></form></b>
          <ins id="5lpvr"><form id="5lpvr"></form></ins>

          <cite id="5lpvr"></cite>

              Welcome to: Ningbo Ligong Online Monitoring Technology Co., Ltd!  Hotline:400-8269-696

              Smart Grid Online Monitoring

              Current location:Home> Products&solutions > Cable partial discharge on - line monitoring system

              Products
              Online Discharge Monitoring System for iPDM2020C Cable

              Online Discharge Monitoring System for iPDM2020C Cable

              The system is based on broadband pulse current detection, waveform separation and UHF anti-interference cable termination / joint partial discharge detection principle. Using clamp-type broadband current sensor installed in the cable skin grounding line to pick up the PD signal, through the high-gain broadband high-frequency amplifier to filter the signal amplification. The time-frequency characteristic method is used to analyze and separate the wide-band current waveform signal to distinguish the different signal sources and sources. The interference signal from the cable connector and the terminal is removed by comparing with the signal collected by the UHF noise antenna. To achieve on-line monitoring of XLPE cable, to detect very low partial discharge, and timely prediction of cable terminals and connectors of the insulation degradation of the degree of failure to prevent high-voltage cable sudden accidents, and state maintenance to provide a scientific basis for data.

               
               
              日韩精品永久免费观看,日韩精品在线播放,日韩精品在线观看,日韩精品在线视频,日韩精品在线中文字幕